Electrotechnisch installatiebureau, alsmede groot- en detailhandel in elektronische goederen; het installeren van brandmeldinstallaties.
Andere professionals in Noord-Holland
De Camper 10, Warmenhuizen
👋 Hallo! Welkom bij Blom Elektrotechniek
Blom Elektrotechniek • Nu online
Van storingen tot complete installaties - we zorgen voor veilige en betrouwbare elektrische oplossingen.
Krijg een persoonlijke offerte voor je project. Gratis en vrijblijvend.
Antwoorden op veelgestelde vragen over Blom Elektrotechniek
Bekijk alle diensten die Blom Elektrotechniek aanbiedt
Lees wat onze klanten zeggen over Blom Elektrotechniek
28 oktober 2024
Someone was supposed to come by for the fourth time today... or fifth, I lost count. I have been waiting for a technician for three hours now, I called them and they said they would call back... deafening silence. This has now been going on for 6 months, every technician says something different, my confidence is now decreasing unfortunately...
13 november 2024
As a tip, clearly ask the price in advance. Call-out costs, diagnosis costs and approximately 180 euros starting fee for the first half hour. This is all separate. For example, a simple socket connection can cost upwards of 300 euros.
23 mei 2024
Boss van Blom beware! If the employees who drive to Amsterdam in their Ford Transit every day apply for a job at Red Bull Racing... they will be hired in no time! or at John Williams' program? worst driver? Keep driving on the left, (even at the traffic light with that slow traffic stop everyone and then almost all of them drive way too fast. I have already called...it was not unknown. This morning the VLT-84-R. Just as well, three stars...we'll stay Warmetuuter, right?
23 juli 2023
Very incompetent staff, just messing around. A shame for the industry. Multiple groups through a tube, low-voltage wiring for 230 volts through a tube, switching wire is used brown wire Welding is done behind a meter board without a junction box, Outside cable, gray is used as zero Grounding in the meter cupboard was loose. On the first day of delivery of our new house I was already electrocuted because the cooking group 2 phase 1 phase was connected to the solar panels and solar panel group 1 phase was connected to the cooking connection, It's unbelievable that you can achieve this like this. Let's hope another solution comes along.
19 november 2023
Was recommended by someone from my new neighborhood. The challenging job has been completed successfully and we are very satisfied with the result. Pleasant contact and professional finish.